I stayed up late last night just knitting. Lots and lots of knitting. I finished another square for the sampler afghan. Then I realized (1) how late it was and (2) how tired I was. I didn’t feel tired at all until I stopped the knitting (and crocheting the edging). It is weird how we sometimes completely lose track of things when we’re completely engrossed in something.
I started another square tonight. It is going fairly quickly. I’ve probably already knitted 2″ and I started about 8:30pm. Casting on takes a while, but I am liking this casting on method much better as it gives much more consistent results.
I am still working on the 1st 1 pound skein of yarn. I know there is one more in the closet. Since I’ve already got 3 (well, technically 4) squares done and I’ll get at least 1 more out of this. I am not sure how things are going to come square number 10-12. I suppose since there is no dye lot, I should technically be able to find more of this Aran color. We’ll see how it goes.
Be the first to comment